plating---gold/silver/red/blue/yellow/black anodizing---powder coating---painting---printing---electroless nickel---zinc phosphate---passivating---e-coating---carburizing---electrolytic Polishing---tumbling---polishing… …


Plating: zinc plating---nickel plating---tin plating---chrome plating---copper plating---yellow zinc---black zinc---dacromet---geomet... ...

common steel: Q235, Q345, 8#/C1008, 10#/C1010, 20#/C1018/C1022, 45#/C1045, 72# spring steel, DC01, Y15/B1113, 42CrMo/4140, 35CrMo, 20CrNiMo, 12(L)14, 12(L)15, SPCC, 12GA/18GA/20GA GVN, music wire, cast ductile iron, ML08, ML10, class8.8… …


stainless steel: 201ss, 202ss, 301ss, 302ss, 303ss, 304ss, 316(L), 317(L), 410SS, 430ss, 18-8ss … …


aluminum: A380, 3003-H14 Alu, 6061, 6063, 5031, 5051, 2011, ADC12… …


Cu: C10200, C12200, C360, C36000, C360 half hard, C3604, C26000, C65100(bronze), H58/62~96 brass, T2 copper… …


powder metal: FC-0208-80/105HT, FN-0405-105HT, F-000-5


others: Ti GR5(TC4), 903 zinc alloy… …

 

 

 

 

 

 

Cutting/blanking---stamping---punching---bending---cold heading---cold drawing---deep drawing---wire cutting---turning---milling---drilling, reaming---chamfering---hardening---carburizing---forging---welding---annealing---quenching---polishing---plating---powder coating---passivating, anodizing---black oxidating… …


Digital Caliper
   
      Projector      Rockwell hardness tester

   
 tensile strength tester     salt spray tester

 

 

 

 

 

 

 

 

 

 

 

 

L/C, T/T, western union and paypal are acceptable

(only irrevocable sight L/C is acceptable and goods value is above USD20000)

 

30% as deposit, the balance will be paid before shipment.

 

If need tooling, 50% of tooling as deposit, the balance will be paid after sample is approved.

 

 

,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Usually a simple sample will cost 10~20days after sample fee is paid.

 

If need do plating or painting, sampling time is 20~25days, if need to use a simple tooling, sampling time is about 20~30days, if do a set of assmbly, sample time is about 30~45days.

 

All in all, if have existing material to use, it will be fast, if do plating or painting or open a tooling, there will be some extra days.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1, to make an offer according to drawings or physical samples.

 

2, to confirm the price, payment, delivery etc.

 

3, to pay tooling charge( if necessory) to make samples to appvoe.

 

4, to pay deposit to make mass production.

 

5, to pay the balance for shipment.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1, Reasonable price

 

2, High quality

 

3, Professional & swift service

WELLDONE METAL MFG., LTD.

PRODUCT CATEGORY

Contact Online Here

 

 

Wechat         skype

 

 

 

 

 

HomeAbout usProductsFeedbackContact us

Copy right © 2002 www.WELLDONE-METAL.com, All rights reserved